Site Inspection Report
The roofing contractor takes care of the execution of a waterproofing system under the supervision of the construction manager, the latter is responsible for overseeing the works and ensures that they are carried out in accordance with the detailed design.
General Membrane has developed a Site Inspection Report protocol to help construction managers oversee a N.E.W. Systems waterproofing projects. This document is an effective tool for scheduling, verifying and testing waterproofing works.
The Site Inspection Report (S.I.R.) drafted by General Membrane utilizes the Company’s know-how for the benefit of its Clients and constitutes a prerequisite for the Compliance Report and the ensuing insurance of the waterproofing system.
This document allows building professionals to benefit from a close cooperation with the Company in order to ensure the waterproofing system attains an extraordinary durability.